Wind Farm Commissioning Date Generation Capacity Off-Take Arrangement
Jam Nagar Wind Farm, Gujarat 08/04/2008 4.8 MW (6 x 0.8 MW) Long Term arrangemnet with GUVNL
Tirunelvel Wind Farm, Tamil Nadu 29/09/2009 16.5 MW (10 x 1.62 MW) Long Term arrangement with TNEB
Jangi – Vandhiya Wind Farm Gujarat 31/03/2010 14.85 MW (9 x 1.65 MW) Long Term arrangement with GUVNL
Theni Wind Farm Tamil Nadu 17/09/2010 9.9 MW (6 x 1.65 MW) Long Term arrangement with TNEB
Jangi – Vandhiya II Wind Farm Gujarat 28/01/2011 9.9 MW (6 x 1.65 MW) Long Term arrangement with GUVNL
Jangi – Vandhiya III (A) Wind Farm Gujarat 16/07/2011 7.2 MW (4 x 1.8 MW) Long Term arrangement with GUVNL
Sub Total (A)
63.15 MW